Kitchen Inner walls

Setting up new walls

-20230729


I wanted to clean upp the layout and surfaces.
Drywall goes upp before measurements are taken.


First wall

 

-20230804


First layers of compound.

-20230916


Screws covered and sanding started.


Sanding completed.

 

-20230923

Painting


Some painting done, first layer

In total three layers were done, two wall needs final touches.
I'll get to that later.

 

Some measurements

Room dimensions can now be taken, due to chimney and the fact that the kitchen part of the house was added sometime in the 70's,
minumim width and length were used to map the room.

Rough sketch..

 

-20250528

Looked around for something to use as kitchen wall tiles.
Found this "stone", Clinker Hannover Black Matte 60cm x 60cm


Sample.

-20250531

I think it looks very nice.


Sample tested.

 

-20250705

Room dimensions resulted in a complete installation of kitchen cabinets.
time to prep and add wall tiles.

First wall outlets need to be moved.



Unscrewed and taped away.

 

Time to add primer, it is needed to prevent the wall from drying out the grout. before any is painted onto walls, everyhing needs to be protected
to avoid splashing.


Solution with primer is prepped.

Thew two walls was painted with primer and then check with light to secure no "dry" spots remain.


Soaked and checked with light.

-20250706

This is what the wall tiles will look like in closeup

 

Time for grout and tiles.


end list cut and testfitted.


Height cut goes first.


Heightcheck.


Some grout mixture, read instructions.


8mm depth.

In the cases that the cutter was unable
a grinder was needed.


Some cutting of corners.


Steady progress.

A lesson learned, don buy just enough, buy more than needed.
New oreder is placed for final box,


90% completed.

-20250711

 

Continuing the walls final touches. adding door liner and floor base molding.

Picked relatively modern style, did not want to deviate from rest of room
design.


First corner cut, allow for door liner.

base molding needed som persuading to conform to old house floors.


Room is a bit warped.

Attemped refrigerator wall base molding, but wall was too porous
taking a break and reurning with som builders glue.

 

-20250712

continuing base molding, added glue to nail positions and use the support pole to puch it in place.


Some pressure added.

Cutting of door liners anf window trim.


Prevent splinters, use tape.


Top liner set with spirit level.

flip the liner and align with to, then mark can be made for cut


Flipped cut.


Simple marking.


builders joint for final touch later.


Stage two for wall warping.

 

-20250713

For the refrigerator a 45 degre rounded cover srtip was added.
Holes vere predrilled and nails and glue used.


Nailed and glued.


Window trim in place

 

-20250810

Covering electrical routing on floor. for a more flush installation, shifting the cable channels some 20mm down by cutting their retainers in half.


Removed, cut, reinstalled.


Testfit parts before glueing in place.


Nailheads cut, drilled into wood.


Nails pushed in, glue added.

 

-20250812

Added a corner piece to cover lower cabinet gap


No cover


Cover added.

 

-20250817

Time to add the final piece of clinker, the walls differed about 5mm to bottom of the cut.


Cutting height and width


Cutting in progress.



String and grout time.


Tile filler


99% complete, sealer to be added


 

-20250823

Time to add the final touch for the walls, grey sealer is applied with specialized tool and then with finger dipped in dishwasher solution.


First application.

Dishwasher solution based on the brand Fairy or Yes dependent on region you live in.
this prevents sealer sticking to finger or tool

Specialized tool used to remove excess and finger is used for final touch.


Solution for tool and finger.


protectiv tape and clear sealer


Depth of field seal.

TBC

-20250812